top of page

ZAMBRANO HELLION MEDICAL CENTER
ABOUT THE PROJECT
Supply, fabrication, and assembly of the steel superstructure. Supply and installation of Hebel panels for façades and interior partitions, including their respective finishes. The hospital has a total construction area of 70,000 m².
– Masonry with internal reinforcement using solid “O” and “U” blocks.
– Slab panels.
– Façade panels.
PROJECTS
HIGH-QUALITY, HIGH-TECH CONSTRUCTION SOLUTIONS
bottom of page





